Agricultural & Irrigation

Field Irrigation Tank Sizing Calculator

This calculator designs a storage tank for the worst case: peak-season crop water use, the hottest expected month and the longest reasonable gap between refills. It starts with ETc from a crop coefficient and reference ET, divides by application efficiency, and scales the result by area and refill interval before adding a safety buffer.

It also answers a question that tank sizing alone cannot: can your water source actually keep up? A tank stores water, it does not create it. Enter a borehole, pump or mains yield and the tool reports the maximum area that source can irrigate at peak demand.

Calculator

How to use this calculator

  1. Enter the area you actually irrigate and choose a crop. The crop selector carries the peak Kc; pick Custom ETc if you already have a measured value.
  2. Set peak ETo, normally the hottest month at about 6 mm/day in a hot dry summer. The tool multiplies it by Kc to get ETc and shows the result in the notes.
  3. Choose an irrigation method. Drip is 90%, sprinkler 75% and furrow 60%; flood 65% and micro-spray 80% are engineering additions, and Custom lets you type your own.
  4. Set the refill interval in days or weeks and a safety buffer of 10–15%. A weekly refill scales the tank by seven compared with daily.
  5. Optionally enter the source yield and pumping hours. If the source cannot meet peak demand, the tool reports the area it can actually water.

The formula

ETc = Kc × ETo
Gross need = ETc ÷ efficiency (mm/day)
Daily demand (m³) = gross need × area (ha) × 10
Tank (L) = daily demand × 1,000 × refill days × buffer
Max area (ha) = source (m³/day) ÷ (gross need × 10)

Variables

SymbolMeaningUnitNote
KcPeak crop coefficient—Mid-season FAO-56 value for the chosen crop.
EToPeak reference ETmm/dayDefaults to 6 mm/day.
effApplication efficiency—Percent converted to a fraction in the formula.
rRefill intervaldaysLongest expected gap between fills.
bSafety buffer—Multiplier from 1.0 to 1.3.

Irrigation efficiency reference

FAO Training Manual No. 4 gives 90% for drip, 75% for sprinkler and 60% for surface or furrow systems. The flood (65%) and micro-spray (80%) values here are practical engineering additions, not published FAO figures. Actual efficiency depends on design, maintenance and application uniformity.

MethodTypical efficiencyBest for
Drip85–95%Orchards, rows, high-value crops
Micro-spray75–85%Trees, nursery, landscape
Sprinkler70–80%Field crops, pasture, turf
Furrow / surface55–70%Row crops on permeable soil
Flood50–70%Flat, level basins and rice

Typical peak crop water needs

ETc in mm/day at three reference ET levels:

CropKcETo 4ETo 6ETo 8
Wheat / barley1.154.66.99.2
Maize1.204.87.29.6
Rice1.204.87.29.6
Sugarcane1.255.07.510.0
Tomatoes1.154.66.99.2
Potatoes1.154.66.99.2
Citrus0.652.63.95.2
Grapes0.853.45.16.8

Citrus assumes no ground cover and about 70% canopy; grapes are table or raisin types.

Matching the tank to the water source

A tank is a buffer, not a supply. Convert the source to m³/day, then divide by gross need × 10 to get the maximum irrigable hectares. If that area is smaller than your field, a bigger tank only postpones the problem: the source still falls short every hot day. The alternative is a larger source, a smaller planted area or staggered planting.

Limits of the estimate

These are planning values. Rainfall credit is excluded, which is conservative. Rice percolation and puddling losses are not included, so rice results are likely low. The default 20 pumping hours per day is a common engineering assumption, not a rule. Confirm critical designs with an irrigation engineer.

Worked example

Three hectares of drip tomatoes, ETo 6 mm/day, an 8 m³/hr borehole pumped 20 hours a day, daily refill and a 10% buffer.

  1. Crop water use: 1.15 × 6 = 6.9 mm/day.
  2. Gross need: 6.9 ÷ 0.90 = 7.67 mm/day.
  3. Daily demand: 7.67 × 3 ha × 10 = 230 m³/day.
  4. Tank: 230 × 1 day × 1.10 = 253 m³, about 253,000 L.
  5. Source: 8 × 20 = 160 m³/day, which is 70 m³/day short. Maximum area = 160 ÷ (7.67 × 10) ≈ 2.09 ha.

Result: A 253,000 L tank is correct for three hectares, but the borehole can only sustain about 2.09 ha at peak. Plant around 2 ha (tank ≈170 m³) or increase the source capacity.

Frequently asked questions

How do I calculate the water tank size for field irrigation?

Multiply Kc by peak ETo, divide by efficiency, multiply by area in hectares and by 10 for m³/day, then multiply by refill days and a safety buffer.

What is ETc and where do I find it?

ETc is crop evapotranspiration, Kc × ETo. Use a local weather station or FAO CLIMWAT for ETo and the FAO-56 Kc table for the crop. Or enter a measured ETc directly.

How much water does one hectare of crops need per day?

At a peak ETc of 7 mm/day and sprinkler efficiency of 75%, about 93 m³ per hectare per day. Drip at 90% would need about 78 m³.

Why is a safety buffer recommended?

It covers unexpected heat, emitter fouling, a delayed refill and measurement error. Ten to fifteen percent is usual; more may be warranted where refills are unreliable.

What is the difference between net and gross irrigation requirement?

Net is what the crop consumes; gross is what you must apply so that the net amount reaches the root zone after losses. Gross equals net divided by efficiency.

Should I account for rainfall when sizing an irrigation tank?

For peak-season worst-case sizing most designers ignore rainfall, which is conservative. If you want a credit, subtract effective rainfall from ETc and enter the result as Custom ETc.

How do I size a tank for drip versus sprinkler?

Drip at 90% efficiency needs about 17% less storage than sprinkler at 75% for the same crop and area, because less water is lost before reaching the root zone.

Sources and verification

Formula verification uses published references and hand-checked examples. We do not claim a named professional has reviewed this page; the method and sources are published instead.

Results are estimates for general information, based on standard geometry, hydraulics and published reference values. They are not engineering, medical, legal or professional advice. Verify critical calculations with a qualified professional and check local requirements.

Keep calculating